Closely Monitor Preventive and Corrective Maintenance of all signaling
system (IXL, RBC, Point Machine, Signal, Axle Counter, OnBoard)
Through USIT tool use Balise programming of fixed Balise.
Prepare punch point excel sheet of stage-03 Indoor and Outdoor Signaling
Equipment and close all punch point with GC and NCRTC.
...
Stage-03 Book of Circuit verification also done and some correction done
by GC.
Perform Dynamic test of trains on mainline to verify all ATP function.
Perform Half yearly and yearly maintenance of train along with update
DBR whitelist. Download EVC, JRU and DRU logs and then analysis it.
Check Playback and JRU logs of track side then analysis the failure and
make a report of it.
Work on AMS (Asset Management System) to create Work order,
Services Request, Checklist prepare for system.
Conducting Inspection and Dynamic Test of Points & Signals
experience
4show moreClosely Monitor Preventive and Corrective Maintenance of all signaling
system (IXL, RBC, Point Machine, Signal, Axle Counter, OnBoard)
Through USIT tool use Balise programming of fixed Balise.
Prepare punch point excel sheet of stage-03 Indoor and Outdoor Signaling
Equipment and close all punch point with GC and NCRTC.
Stage-03 Book of Circuit verification also done and some correction done
by GC.
Perform Dynamic test of trains on mainline to verify all ATP function.
Perform Half yearly and yearly maintenance of train along with update
DBR whitelist. Download EVC, JRU and DRU logs and then analysis it.
Check Playback and JRU logs of track side then analysis the failure and
make a report of it.
Work on AMS (Asset Management System) to create Work order,
Services Request, Checklist prepare for system.
Conducting Inspection and Dynamic Test of Points & Signals
experience
4